Follow me as I help my family build a new house. During this time, I will tell you how we did it.
Tuesday, 26 July 2016
Step 10: Pour Basement Concrete
Today we poured the concrete for the basement floor. The concrete floor is so much cleaner then the mud and dirt that was there before. But before we could pour the concrete we had to make sure all the plumbing under the floor was completed and inspected. And then we had to put in an 8" layer of gravel and poly for vapor barrier.
Now that the concrete is done, we can start framing the basement walls and install the furnaces.
Saturday, 16 July 2016
Step 9: Roofing
Now that the framing is done, it is time for roofing. The roof keeps the water out and it is important to get our house water proof as soon as possible so we can start doing more work inside.
Our roof starts with a layer of tar paper and then we nail down the shingles. These shingles are Dual Black colour in the Cambridge style. I like how they look.
Our roof starts with a layer of tar paper and then we nail down the shingles. These shingles are Dual Black colour in the Cambridge style. I like how they look.