Monday 9 January 2017

Step 12: Plumbing Rough-in

The plumbing Rough-in actually started at the beginning of the construction project.  Some pipes had to be done before the concrete was poured. 

Other pipes continued through the walls and floors to all the sinks, showers, and toilets.  The big pipes are for the sewer or drains.  The small pipes are for the water lines.

No comments:

Post a Comment